FREE DISCREET SHIPPING ON ORDERS $59+
Contact: support@temptcove.com






A distinctive honeycomb shape, an airy openwork shell and a close-fitting profile. This ABS male chastity cage combines enclosing coverage with ventilation, smooth contact surfaces and a compact integrated metal lock. Choose Pink or Black, one of four cage sizes and your preferred flat or curved base rings.
Hexagonal openings across the cage allow air to circulate and help reduce heat and moisture buildup without losing the enclosing shape. The lightweight body helps reduce downward pull compared with heavier cages, while the wider front opening makes bathroom access easier.


Carefully finished surfaces and smooth edges make contact comfortable. Wear testing confirmed easy fitting and comfortable extended wear without irritation. The ergonomic profile stays close to the body, and the curved-ring option provides extra clearance at the base to help reduce pinching.
A suitable size is essential to comfort. Check your fit before wearing and remove the device if you experience pain, numbness or discomfort.

The cage and base ring connect around an integrated metal lock cylinder, keeping the assembly low-profile for discreet wear beneath clothing. The removable cylinder secures the cage without a bulky external padlock. Each set comes with two keys.

Select Flat Rings for a flat profile or Arc Rings for a curved profile. Your set includes four rings in the selected style, so you can compare the fit within that profile.

| Size | Diagram label | Diagrammed length* |
|---|---|---|
| Nano | S | 58 mm / approx. 2.28 in |
| Small | M | 66 mm / approx. 2.60 in |
| Standard | L | 80 mm / approx. 3.15 in |
| Large | XL | 100 mm / approx. 3.94 in |
*These values follow the curved length arrows in the dimension diagrams; they are not straight internal cage lengths. Dimensions are approximate and may vary with measuring methods.
Compare the diagrams and visit our chastity cage size guide before choosing your size.
Approximate weight per shipped set: 77 g (0.077 kg).
The lightweight body and ergonomic profile suit an active routine, whether your day involves cycling, running or hiking. Check the fit as your activity changes, and choose a size that allows comfortable movement.
Separate the cage and ring and remove the lock cylinder before washing. Clean the cage and ring, dry them thoroughly and inspect the surfaces before putting the device back on.

Explore more styles in our resin and plastic chastity cage collection.
Thanks for subscribing!
This email has been registered!